Setting up in the sunshine for our first Exhibition of 2021
Laying track is the first order of the day.
All hands on deck.
Intense concentration getting things ready.
Gazebo erected to protect us from the sun.
Track down now for testing.
Trains at long last being tested on the track.
Checking track connections
Running live steam.
LGB Digital MTS running on the outside line.
Digital MTS, Live Steam and Radio Controlled battery operated trains.
The next generation viewing the trains.